What are the maximum ramp times?
The maximum ramp time in a motion task can be calculated by:
t{ms} = 140/32 x nsetp with PRBASE 16, 20 oder
t{ms} = 140/32 x 16 x nsetp with PRBASE = 24.
Reduction while braking: tmax = 8000ms
Speed controller: t{ms} = 140 x 128 x n{rpm}
Home >
Knowledge Base >
FAQs >
Downloads >